Yes it's scratch built.I have been dealing with medical issues and been on vacation from the layout about 4 years now trying to get back to it so I can proceed with laying track. Wife been throwing crap in the layout room a few years now so clean up is rough!!!
I still have that list got the leg replacement in February and it's horrible my left leg is almost completely metal.Larry is still around you can find him on Facebook it's been about 6 months since I spoke with him he is back to doing metal art
This is what's on my surgery list as of now- complete revision surgery of right hip which is new,complete total left hip replacement, complete total right knee replacement
I wished it was unfortunately not but II'm taking a break after this recovery plan on using the layout as part of my physical therapy once I gain more mobility and get the wife's crap out she has been putting in there thinking I don't know
Thanks guys I still have long road with more surgeries in the future getting over this one has been the most painful experience I have had so far I'm not use to being confined basically to a hospital bed for going on 6 week s now driving me nuts
Been doing some thinking since I never got around to really finish track design I was working on a yard I don't see the need for it considering I just want to run my trains and the 10,12,15 foot sideings off the Mains with single branches to industry's is all I need plenty of parking without...
Wanted to drop in and say hi to everyone it's been awhile!!! The layout has set idle for a while now and I'm feeling the urge to get back at it only problem is I'm week 5 learning to walk again after a very complicated knee replacement after I manage to get around better I want to start again I...