Oakridge yard Schematic
SouPac

Oakridge yard Schematic

When I originally designed the layout I was planning on just a normal ladder yard with the mainline going down the middle.
The more I got into the SP's operations there, the more I realized I wanted to do something else more in keeping with the SP's operations in Oakridge at its peak but in a modern day... at least 1996 anyway.

The red lines represent trackage under CTC control. All others are either train-order or local switching control.

Although it was in the original plan, it just wasn't practical to include the wye. A 1:1 Humanicrane will have to step in now and then.
There are no comments to display.

Media information

Category
Track Plans
Added by
SouPac
Date added
View count
2,908
Comment count
0
Rating
0.00 star(s) 0 ratings

Share this media




Back
Top