What makes the separate service lead seem "unprototypical" and impractical in this design is the fact it is parallel to the yard ladder that can easily feed the service tracks. Bottom line for a RR is what does the job that is simple, cheap, and with design dependent on space. I doubt you will find any two yards alike in the US, so ToyGuy could go most any direction he thinks will get the job done for what he wants to do.![]()
Just so we're clear on why I proposed the separate lead, it has NOTHING to do with improving access to the service tracks. The two reasons it was suggested was because as it was drawn, not having a separate lead meant that it consumed 1/3 of the class tracks (since you had to leave the 3rd class track open for tail room), and by making the separate lead it would allow you to create a runaround inside the yard that the switcher could use to spot the tracks on the switchback. Without that runaround it would require the switcher to foul the main track and to use the longest track in the yard as part of the runaround. While that could certainly be done, in order to have one engine run around the cars and spot the switchback in the as drawn plan would mean that only two stub ended class tracks in the yard could contain cars not associated with the move, since ALL the other tracks in the yard would have to be used for the runaround and switchback move. By having the separate lead it and runaround it dramatically increases the flexibility and capacity of the yard.
The reason for the lead isn't about getting engines to and from the service tracks, the reason for the separate lead is to improve the physical capacity of the yard and the situation for the yard engine.
An alternative solution would be to add one additional track to the width of the yard, preserving the 3rd class track as a class track and making a dedicated tail track to get into the service facilities (you still have to clear the main and one track to make a runaround).
