What's happening on your layout?

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.




Doing some old school DC wiring
 

Attachments

  • IMG_2372.jpeg
    IMG_2372.jpeg
    648.7 KB · Views: 227
  • IMG_2355.jpeg
    IMG_2355.jpeg
    1.1 MB · Views: 237
  • IMG_2358.jpeg
    IMG_2358.jpeg
    569.3 KB · Views: 240
  • IMG_2360.jpeg
    IMG_2360.jpeg
    708.2 KB · Views: 246
  • IMG_2356.jpeg
    IMG_2356.jpeg
    515 KB · Views: 226
Hello
Well organized, did some of that myself this weekend. The layout I'm building will have 2 reverse loops. The first one is finished and train-tested.
The track used, curves are ridged, I lay out the route, & screw mount it. Come back pull it all up, tape & paint it.

Go back with the roadbed, as it dries, solder drops to every section. Reinstall the track, wire & train test. The models I see on your layout have me thinking I'm seeing N scale.

I removed my N scale last July and started on this one. I also see you're a Santa Fe fan like myself. I have some pretty nice cabooses, well detailed you could be interested in. Also, have just about every GHQ vehicle ever sold.

Just saying

example
DSCN1381.JPGDSCN1398.JPG

Pep
 
4 more feet to go!

Got some prices on plywood yesterday. Good Lord! Expensive!! It’s gonna be a while until that project happens.View attachment 213120View attachment 213121

Hello
Not one to nick-pick, however from experience .............. finish the ceiling. I had open rafters & hated it, thought it would never bother me.
IMG_1988.jpeg

I left the I beam & duct exposed, keeping an industrial flavor to the room
IMG_2102.jpeg

Just saying Pep
 


I think I can call it finished. At least for now. The last thing I did after this photos was to attach the far left platform and freight room to the rest of the structure. I had to do this on the layout to get everything lined up properly before the glue set.

Now I'm waiting for 55 conifers to show up and a platform extension that will be placed on the right.

file.php
 
Been laying track like a mad man!
(was going to insert a "crazy man" gif here, but after looking at a few examples with Gary Busey and William DeFoe in my Google search, I felt a little scared, and dirty...)

With spring in the air and summer time employment ramping up, I won't have a ton of time to spend on the layout. I'd like to have trains running so I can play when the mood strikes me. :)
 
Now it's really finished. New platform built, new parking lot, and plenty of trees. Schwarzburg even repaved a short stretch of road to the station to get the bumps out.
 

Attachments

  • 20250401_154717.jpg
    20250401_154717.jpg
    593.3 KB · Views: 235
  • 20250401_145149.jpg
    20250401_145149.jpg
    661.8 KB · Views: 240
  • 20250401_154746.jpg
    20250401_154746.jpg
    576.5 KB · Views: 223
  • 20250401_131441.jpg
    20250401_131441.jpg
    350.1 KB · Views: 259
Unless the forecast changes...nothing this weekend :(.

I'm working on benchwork and do the cutting outside, the weather has not cooperated much since I started this in February (perhaps unsurprisingly).

On the up side, the layout's coffers aren't too bad since I've been putting the money I would have spent aside until a nice weekend 🌞🤞
 


Since 9/2022 I’ve done nothing on my transload facility. This morning I pulled up 30” of the track work from the right of the pit to start the rebuild of the facility.
IMG_6566.jpeg
IMG_6567.jpeg

I have replaced the wood ties with Central Valley tie strips.

IMG_6569.jpeg
IMG_6570.jpeg

The 1-2-3 blocks and soda cans are weighing down the tie strips while the glue dries
 




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top