What to do with the seams between foamboards?

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


videobruce

Tower Operator
Not really a "design" question, but using 1/2" rigid foamboard over 3/8" plywood with seams staggered so they are not in line with the plywood seams.

Can/should the seams between the foamboards be covered over like drywall seams? If not, isn't movement a issue and the resulting cracks?
 
Just use latex caulk in between the seems. Thats what I did. The caulk is flexible enough not to crack.
 


I would think that using an adhesive between the foam boards would keep them from shifting from each other. Subsequent layers of scenery on top of the joints would coceal them.
 
Depending on what is going to appear on the uneven or gapped surface, you can just place a single spanning layer of the green painter's tape over the gap, spray glue, and sprinkle ground foam, or use smallish clusters of ground foam to make a hedge row. You could place styrene slabs atop the gaps to act as roadway.

When I need embankments, gaps filled, or hills, I mix a batch of Plaster of Paris, Portland cement, fine-ground vermiculite, a dash of powdered masonry dye, and when it is hydrated I trowel it into place. The stuff is great for anchoring trees and utility poles.

The caulk would work, too, but it is much harder to drill it out so that poles can be stuck into it.
 




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top