NVSrr1500
Well-Known Member
Been a good run. Got the staging from the old layout in place and found was able to add two tracks. The ladder is together and working and tested. And all wired. allowing the benchwork for the yard to be put in. and the junction. Started laying out the yard, junction and port. It only resembles the track plan in concept with some elements. It really shows how a track plan can need to be altered from plan. Also shows how you have to know the space. Next up. reconfigure the room lighting. Straighten up the room , move buildings in to start the laying out of the rest of it. Of course test stain ties, and get the rails weather etched before rust weather them. And at some point soon, start the lift and bascule bridges since they are bot huge. even by by scale standards. Focusing on the clean up and ties and rail work mostly next weekend