ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.
Back into this after a 30 ish year hiatus. This is my progress working this in my spare time. I am at the point where i have an operational layout and can begin major landscaping. Note: i am not a fan of over and under bridges but i have many grandchildren that will enjoy seeing it.
Back into this after a 30 ish year hiatus. This is my progress working this in my spare time. I am at the point where i have an operational layout and can begin major landscaping. Note: i am not a fan of over and under bridges but i have many grandchildren that will enjoy seeing it.
The piers are Atlas #80 Over and under pier set. Plate girder bridges are Atlas #896, deck truss bridge is Atlas #84 and the curved chord truss bridge is Atlas #888. The lowers straight sections are Atlas #82 pier girders. I used a door shim at each landing because i dont have the 1/4" height difference for roadbed. ALL track is Atlas code 100.
The entire layout is sitting in 1/4" cork sheets.
I'll soon find out. by design, I'm I'll run 4 locomotives, 1) a PRR passenger train on the main line only. 2) a sw7 breaking down and building trains in the yard sidings for local and road trains.3) a GP-38(this unit never crosses the bridge) to run locals to all of the industries. 4) an SD40-2 to haul long road trains to and from the yard.
I am designing a system of cards (one for each car) to dispatch and track all of the freight cars.
Im now 6 monthish in and fully operational. pardon the elementary school paint. Its how i imagine what is what. Im about to start shaping rock faces and then ballasting. lots of scene separating to do with trees and such planned. Advice and opinions welcomed.