Well, as I've said several times, it's a heck of a journey!
Over in the coffee shop thread for this month, Willie rightly pointed out that I haven't been working on my layout, like I said I was going to.
I started to ask why that is? After some thinking time...
Frankly... I keep getting overwhelmed by the scope of the project. That's a lot of terrain.
And, I'm getting older and fatter. Trying to bend or reach is becoming a challenge. Double deckers don't support either getting older, or getting fatter. One deck is too high, the other has too little clearance above....
Another part of the issue is I chase Shiny Squirrels (I combine the
"ohhhhh! SHINY!" and go wandering off following the shiny –Along With– I'm like a dog out on a sniff patrol who spots movement, the ears perk up,
SQUIRREL! and then they're off in a flash as the squirrels run hither and tither and the dog sprints for them... I got both at once. Shiny Squirrels distract me.
Usually it hits when I get to a point in one project that makes me pause for a big think... And the track planning gave me that pause...
So, the gaming (little toy soldiers) hobby kicked in with new games or revisions of old. And you can't play with half an army, so I've been chucking paint on a lot of little soldiers to get a full force or two on the battlefield.
But something else started to settle into my conscious thoughts after Willie's comment about not working on the layout...
Have I made the project too big?
A double decker means a helix at some point.
View attachment 261190
It means neither deck is where I can comfortably reach the back corners
View attachment 261191
I'm too the point where I need to start putting plaster cloth down on the inclines for the upper level. After that, it's cork roadbed and then track and ballast. Once I begin that part, I don't want to be messing with the structure of the benchwork. The time to decide what to do is now. Not later.
Do I downscale and drop to one level in the same footprint?
You can see what the lower level has become. A catch all...
The lower level is at 36-37 inches off the floor. The upper level at 55 inches.
Here's the Pro's for the drop down to one level, and eliminate the other level.
I can reach the back corner of the upper only with a step stool. Looks like my armpit is about 53 inches high with my indoor crocs on. So a 48-inch height would be sensible. Neither level fits that height. And trying to get under the upper level for back corners on the lower deck turns me into a pretzel.
If I go to a 48 inch height for the main deck, I can eliminate the lower level, and reuse parts for taller legs to support the upper. I'll have more room to get under the layout for wiring.
The big reason: It reduces the scale of what I have do. The project moves from almost too much to manage intimidation factor, down to something more manageable. No BIG overwhelm attached to it. The overwhelm has a smaller frame, so it's easier to see the end...
If I eliminate the lower level, and readajust the upper level to a manageable height, I can add more foam height to the deck, and get more downward construction room for rivers and terrain features.
I can plan for a below deck staging yard. Not sceniced, and a tight reach, but enough to store the trains I haven't purchased yet.
The Cons for dropping to one level
Disapproving looks from the wife
Expansion becomes an issue, but a minor one. I can shelf layout several parts of the basement if I want to expand. I doubt I'll give up the gaming area (behind me as I take the pics of the layout)... but there is room to downsize that and allow a manageable expansion of the model railroad.
But, expansion is years in the future. I have to finish what's in front of me. I'll deal with that later.
Doing the demolition of the lower level and lowering the upper level will take time. I probably won't get to the roadbed and track-laying until late summer.
What am I missing as I muse this over? Or is it mull it over? Feel free to let me know your thoughts? Have you done something similar?