ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


PeterA

Member
In my town they're replacing ties and fresh ballast on the tracks. Snapped these pics today. Found them amusing.

qu7ydasa.jpg

azymahed.jpg


Sent from Pete's Pad using Tapatalk
 
A couple of years ago they re did the track that runs outside our place as well. Was an interesting week or so while they did it.
 
A couple of years ago they re did the track that runs outside our place as well. Was an interesting week or so while they did it.

Yea I thought it was funny that they actually drove the digger up not the car with ballast in it.


Sent from Pete's Pad using Tapatalk
 


About 14 years ago was a BNSF conductor on a ballast train. It was put down by a string of hoppers 1 car at a time by the track gang foreman.
 
About 14 years ago was a BNSF conductor on a ballast train. It was put down by a string of hoppers 1 car at a time by the track gang foreman.

Yea, it was about three weeks ago I was coming home from. Work at night, the engine was there sitting with its number board and markers lit up. Went back the next day to get a pic and it was gone, just the hoppers sitting there.


Sent from Pete's Pad using Tapatalk
 
Watched a switch being replaced a couple years ago. They brought in a flat car with parts and a crane. The parts where layed out beside the tracks and assembled on the first day. On the second day they removed the old switch, level the bed, using two cranes they picked up the assembled new switch and placed it where the old one was. It was not unlike what we do to replace a switch on a layout but, in a much larger scale.
 
Watched a switch being replaced a couple years ago. They brought in a flat car with parts and a crane. The parts where layed out beside the tracks and assembled on the first day. On the second day they removed the old switch, level the bed, using two cranes they picked up the assembled new switch and placed it where the old one was. It was not unlike what we do to replace a switch on a layout but, in a much larger scale.

Yea I think getting a chance to see these things helps with ideas on your layouts too.