I tore the old layout apart, saved the benchwork frame and back drop, then attached 1/4" cork on top of 1/4" plywood.
Track is on order.
This is going to be built for prototype operation. I was stuck in a rut and couldn't get my ideas on paper to where I was happy with the results. I consulted with Lance Mindheim and give him credit for the track plan.
It's Summer so I will be outside more than inside, but will post as I progress.
Track is on order.
This is going to be built for prototype operation. I was stuck in a rut and couldn't get my ideas on paper to where I was happy with the results. I consulted with Lance Mindheim and give him credit for the track plan.
It's Summer so I will be outside more than inside, but will post as I progress.
