Smudge617
Well-Known Member
Well, the 60/40 layout has vanished in the mists of time and a new layout begins.
So far I've managed to turn this.
Into this.
I bought this second-hand, the previous owner was an N-scaler, as you can see.
The original plan has changed dramatically from what I was intending, as the table is now 2' shorter than it was supposed to be. I found that a 12' table was NOT going to fit in the space.
The original plan, as laid out below, is for a 6' X12' layout.
The plan was, is, to build out one side using open-frame benchwork to maximise the width, (smaller 6" cut-away is for a control panel, point switches, as well as a small programming/test track that I will need to build)
I'm using foam board on a plywood base for the first time, so this should be interesting, and I'll be asking questions. All track is Peco Code 100
The basic idea was to have on the left side an incline on the inner track, and that would pass over a bridge and drop down again to an industrial area where it would level out and then drop again as it curves around the bottom right-hand curve.
The plans below are the ORIGINAL plans I made, but they give a general idea of what I wanted to build, and I will now revise
Note.
The space in the top right corner is supposed to be there. I've had a custom-made Peco medium crossover with slip, which is where it's supposed to go.
So far I've managed to turn this.
Into this.
I bought this second-hand, the previous owner was an N-scaler, as you can see.
The original plan has changed dramatically from what I was intending, as the table is now 2' shorter than it was supposed to be. I found that a 12' table was NOT going to fit in the space.
The original plan, as laid out below, is for a 6' X12' layout.
The plan was, is, to build out one side using open-frame benchwork to maximise the width, (smaller 6" cut-away is for a control panel, point switches, as well as a small programming/test track that I will need to build)
I'm using foam board on a plywood base for the first time, so this should be interesting, and I'll be asking questions. All track is Peco Code 100
The basic idea was to have on the left side an incline on the inner track, and that would pass over a bridge and drop down again to an industrial area where it would level out and then drop again as it curves around the bottom right-hand curve.
The plans below are the ORIGINAL plans I made, but they give a general idea of what I wanted to build, and I will now revise
Note.
The space in the top right corner is supposed to be there. I've had a custom-made Peco medium crossover with slip, which is where it's supposed to go.
