The “Give Tony Grief” Thread

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


Hmm I was going to email Ken's Electronics BUT they demand that you include your address and phone number to get an answer. I don't give my phone number to anyone I don't know. I'll have to find another retailer for them :)
I think that's not the correct one He's never asked me for a phone number His contact is email

https://www.classixaudio.com/MRR_INDEX.htm

He's in Ontario Canada
 
Last edited:
While looking through some of my "hidden stuff" I found two brand new "Wyes" so am going to use them in the extension track and make that (in part) a double track :) So much for "just fixing what was there" :D:D:D
 


So this should give you an idea of where I am going with this, at least where the track is going :)

wRemKM8.jpg


iXJsImF.jpg


7bKYtAR.jpg


This adds about another 10 feet of track to the layout - 20 when/if I double track it :)
 
Gawd Tony! With that thing you should be able to run all your switch machines, your next door neighbor's and the neighbor next to him with only ONE button push for all.

Later
Tony thought he needed one for each of the 4 PL11's switch motor's, he would have been able to run every switch motor in the state with that many. 🤣
 
Tony thought he needed one for each of the 4 PL11's switch motor's, he would have been able to run every switch motor in the state with that many. 🤣

Hmm - now THAT sounds like a money making thought !!! :D :D 😅
It should be clearly marked for Input/Output terminals, you know how dumb us Brits are.:D

Not really BUT, I'm learning ....... 😅😅😅🍻

By the way - good to have the old Smudge back :)
 


So this should give you an idea of where I am going with this, at least where the track is going :)

wRemKM8.jpg


iXJsImF.jpg


7bKYtAR.jpg


This adds about another 10 feet of track to the layout - 20 when/if I double track it :)
What scenic s do you have in mind between the the track you have now and the new section ?
 
Oh that's an easy one - it is going to be a HUGE gorge, all the way to the floor 😅 😅

That's a good question Smudge and something I have been mulling over. I want a river in this section and think it will go in the right hand side running from the nearest wall to the front of the layout. So that area will be a gorge of sorts.

As for the rest, I think I will continue the mountains and blend them into the existing layout but honestly - I'm not really sure.
 






Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top