Lifted06Titan
New Member
I have the Walthers sawmill and outbuildings set and I am having a hard time figuring out how to place it on my switching layout. I messed around using some old peices of track to get it to work. I am open to any ideas.
The raw logs will come in by train and be unloaded with an overhead crane. The mill will produce both finished lumber and sawdust. I did some research on large sawmills and I just can't figure out how to get it to work with the space I have.
The raw logs will come in by train and be unloaded with an overhead crane. The mill will produce both finished lumber and sawdust. I did some research on large sawmills and I just can't figure out how to get it to work with the space I have.
