TLOC
Well-Known Member
Good morning from Wisconsin. This is getting old! -3f but feels like -13. Dry for the next 10 days which means snow of 2-3” in the next day or so! The weather guessers have been decent on the temperatures but they are big time failures on snowfall.
The roofers were out yesterday afternoon. It’s not a roof issue. It’s called the sun warming and melting the snow on the roof. Because it is still so cold out it’s freezing again right when it slides off. They will come out this Spring though to fix the gutter. The icicles are forming between the roof edging and the cutter.
Taking a few days away from the structure build projects as I hope to complete the re-build of my lead into the paper mill. I still only have mild interest in my layout but I’d like to be able to access my only 2 staging tracks. The layout as a whole runs pretty good. If I get this track work redone I will rip out issue #2 and hope to get it re-done in less than the year this one is taking me. I also will be tuning up my Dremel band saw.
Tomorrow is a layout work session 45 minutes north of me. 1st session of the year at this layout for me. A little bit of everything as the track laying and soldering guys will be there. Sounds like I will be hot gluing cardboard strips and carving some foam for landscape forms. He has some paper mill kits he wants me to bring home and kit bash. He’s already cut the bases for the dimension of each structure so I just to to cut to fit. He also has a new band saw blade for my Dremel saw that I have not used in forever. Cutting Walthers paper mill kit walls needs a touch more cutting power than a Zona saw, a jeweler saw and the ever faithful #11 blade. He has 2 Superior paper mill kits and at least 1 Recovery boiler building for me. I also will out together his pulp storage tanks as he has a few besides the 2 in each Superior kit. Those are selling for gold type pricing online. He wants to use 3 and sell off the rest. It takes longer to clean them up than anything else with them. For this kit bashing I’ll get paid off in Black Sintra pvc board. For scratch building I use it as support for the structures I build. I laminate styrene to it. Works great for me
Be well, stay warm
The roofers were out yesterday afternoon. It’s not a roof issue. It’s called the sun warming and melting the snow on the roof. Because it is still so cold out it’s freezing again right when it slides off. They will come out this Spring though to fix the gutter. The icicles are forming between the roof edging and the cutter.
Taking a few days away from the structure build projects as I hope to complete the re-build of my lead into the paper mill. I still only have mild interest in my layout but I’d like to be able to access my only 2 staging tracks. The layout as a whole runs pretty good. If I get this track work redone I will rip out issue #2 and hope to get it re-done in less than the year this one is taking me. I also will be tuning up my Dremel band saw.
Tomorrow is a layout work session 45 minutes north of me. 1st session of the year at this layout for me. A little bit of everything as the track laying and soldering guys will be there. Sounds like I will be hot gluing cardboard strips and carving some foam for landscape forms. He has some paper mill kits he wants me to bring home and kit bash. He’s already cut the bases for the dimension of each structure so I just to to cut to fit. He also has a new band saw blade for my Dremel saw that I have not used in forever. Cutting Walthers paper mill kit walls needs a touch more cutting power than a Zona saw, a jeweler saw and the ever faithful #11 blade. He has 2 Superior paper mill kits and at least 1 Recovery boiler building for me. I also will out together his pulp storage tanks as he has a few besides the 2 in each Superior kit. Those are selling for gold type pricing online. He wants to use 3 and sell off the rest. It takes longer to clean them up than anything else with them. For this kit bashing I’ll get paid off in Black Sintra pvc board. For scratch building I use it as support for the structures I build. I laminate styrene to it. Works great for me
Be well, stay warm
