troyphoto
Snarky Old Fart (in training)
Well, howdy there internet peeps in your snow drifts and igloos.
I'm hunkered down in the basement. Snow got rained off yesterday, but the roads and parking lots are S.L.I.C.K!
The Nscale club is trying their ops session today. Sounds like the 20 min drive to get there will be along the lines of 40min or longer, with a very slick parking lot, according to the head conductor.
Looks like, I'll be in the basement cave today instead of the ops session.
good news, I got the basics of the figure 8 on my layout figured out after about 4 sheets of graph paper. Here it is... for now, it will probably change as I start laying out the foam risers.
In my post from yesterday, Pic 1 is of the right side. Pic 2 of the middle back, etc,
Key:
PINK Text = 3 or 4 inch above grade
Orange/red text = 2% grade
Yellow = at grade
Green = 2% grade transition
The grade start and stops are guestimates until I get the foam down, and start measureing.
For those NScalers out there, what is the minimum clearance for cork+Track+car to do an underpass? Looks like 1.5 inch with what I've got on hand for standard box cars. I do plan on running passenger service, and those cars are buried in the boxes under the layout at the moment.
I'm hunkered down in the basement. Snow got rained off yesterday, but the roads and parking lots are S.L.I.C.K!
The Nscale club is trying their ops session today. Sounds like the 20 min drive to get there will be along the lines of 40min or longer, with a very slick parking lot, according to the head conductor.
Looks like, I'll be in the basement cave today instead of the ops session.
good news, I got the basics of the figure 8 on my layout figured out after about 4 sheets of graph paper. Here it is... for now, it will probably change as I start laying out the foam risers.
In my post from yesterday, Pic 1 is of the right side. Pic 2 of the middle back, etc,
Key:
PINK Text = 3 or 4 inch above grade
Orange/red text = 2% grade
Yellow = at grade
Green = 2% grade transition
The grade start and stops are guestimates until I get the foam down, and start measureing.
For those NScalers out there, what is the minimum clearance for cork+Track+car to do an underpass? Looks like 1.5 inch with what I've got on hand for standard box cars. I do plan on running passenger service, and those cars are buried in the boxes under the layout at the moment.
