Good morning y'all. It is currently 28 with a feel of 21. We are now on day 2 of no rain, however we did have a few snow flurries around midday yesterday. No chance for anything to stick, but the local grocery stores still sold out of milk, bread, and eggs. It is supposed to be clear with highs in the low 50s the next 2 days before the rain returns on Friday with a 70 percent chance. Looking ahead over the 10 day, I see rain on Sunday, Tuesday, and Wednesday. Makes it hard to plan outdoor work this way, but it is the nature of landscaping.
Flo- Coffee and French toast please, don't forget the bacon. Thanks.
Also a big thanks to all who have liked and commented on my layout pics. It is starting to come together nicely.
The construction crew finally finished the maintenance office, after having to once again rebuild 2 sides. Twice. Once due to the construction adhesive setting up with the walls in the wrong place (giving them slack on this one, they had an emergency situation to address) and once due to improper measuring. The pieces were too short and the gap in the wall was big enough to drive a truck through. They also had to rebuild the loading dock. One of the crew saw a spot he wasn't happy with and tried to repair it, creating a large crease in the top of the dock surface. He was reprimanded with a stern word, but the new dock is actually better so no further discipline will be issued.
Progress is once again slowed to a crawl due to a materials shortage, which is just a fancy way to blame lack of progress on waiting for the postal service to deliver my roadbed. I have a few things I can work on now, but until the track has been raised to its final height I cannot add many more details. This means I have plenty of opportunity to stare at my buildings and question placement of the smaller structures as well as plan out the other additions that will be made after the buildings are set into place permanently.
I took a few photos last night, but they are still on my phone. I will update this post with them soon. Right now I hear my second cup of coffee calling my name.
Y'all have a blessed day. And pay no attention to the rodent, he has absolutely no idea what he's talking about.
Post Edit: pictures
I shifted the office out a little. There will be a covered walk and steps leading into the terminal from the back door of the office.
The new dock in place and the building pinned down to better align the doors with the dock. The ramp will serve to get the forklifts in and out of the building as needed.
I left a little space so the roof wouldn't be right against the side of the shop. There will be a covered walk leading from the side door into the shop. This will allow access to the parts counter that will make up most of the space this building occupies. There will also be an office for the service manager and a break room for the mechanics.
This area will serve as employee parking, while the area directly in front (right side of office) will be reserved for the service manager. He has been informed that he is no better than the mechanics, but he refuses to park next to them anyway. Once detailing is completed, I will have windows in place and as much interior detail as possible. I know it will most likely never be seen, especially after attaching the roof, but I will know it's there and that's all that really matters.
I have decided that I can probably build part of the internal dock area in the main terminal. It will need to be tiered anyway since the boxcars will sit higher than the trailers so I am going to build the lower tier and then add the upper tier on top of it once the roadbed is in. The oil and compressor area for the shop is most likely going to be a pole structure with fencing wrapped around it, so it has to be added after the building is secured as well. That being said, does anyone have a suggestion for what could be used to represent chain link fence in N scale?