Latest house pics and news.
I mentioned having put one window in myself a week or two ago. I need to take it out and reset it as I guess my eyes were playing tricks on me when we put it in and it is sticking out 1/8 or 1/4" instead of recessed. The people who will install my windows came out a few days ago after work and did one window as a test since these are windows they don't see often -- insert with bracket Euro style tilt and turn windows vs traditional nail flange American windows. They wanted me to see how they would do it and if I approved. They did a good job and will be back next Saturday. They were booked out during the normal work week for quite awhile but to get their best people they asked if they could do it on a Saturday. They are also giving me a good deal. They do windows for the house builder who has been helping me run the job (they basically send me their subs if I need them and also run the money for the bank and scheduled inspections -- friends of the family for 25 years) so they are a known entity. They also were easy to talk to and deal with. Their install is on the right.
The plumber finally came last Monday and got the vent in the roof. We just have one. Everything they can get to hit that vent they will. Everything else will vent through the inside-the-cabinet type vents. Now the roof guys can get started 9which they are doing Monday). You can see the vent sticking out of the roof.

The electricians have not been here for almost 3 weeks but they did work a couple days each week for a few weeks at the beginning of July and they are coming back Monday. Plumbers have also been in this whole week doing things.

Several weeks ago we installed doors from the basement into the basement under the garage. Now we can leave stuff and it is locked up. I don't know if I ever posted pics so here are some.

The in-wall toilet in the master bath had an issue with the wall. The toilet tank frame sits inside the wall and that wall happened to be right above a joist and so we couldn't put a drain pipe in. So I built a 2x4 wall "extension" inside the toilet room so that that wall is now a ' 10" ' wall and the toilet can be installed and the drain pipe will miss the joist.

And a general view of the fornt as it was yesterday
I was also trying to get the tub for the Ofuro (Japanese style bathing room) ordered this week -- guy promised to send me an invoice I could pay on so they'd start the week long custom build but I have not seen it yet. Need it to get done so the plumbers can do their thing and line up the drains etc.
Also was trying to get the guy who is supposed to drill our geothermal shafts scheduled. I had started talking to him again several months ago but that conversation kind of petered out as I was busy and now he is scheduled through the end of the Fall.

. He did say he'd see if he could squeeze me in somewhere. Hopefully he'll get back to me.
Also been working with the guy who is supposed to build all the control and water distribution panels (the plumbing part -- I have the controllers here to hook up) for the snow melt system and the house radiant...
And also been working to get the water treatment pieces ordered as well. (salt less water conditionser, various filters, anti flouride, anti heavy metal, etc system).
I asked my boss last Monday evening through a Slack message for Thursdays and Fridays off through mid November as the bank has laid down that as a final deadline. He never responded to my Slack so I assume it is ok. I did say I'd go to morning meetings and if any high priority escalations happened I'd work those etc. I'm not going to be in Hawaii with the phone and network turned off. I did get 1/2 of Thursday taken and 3/4 of Friday. (We had some big direction changes at work Thursday so there were some important meetings and stuff to attend to).