Running Bear's August 2022 Coffee Shop

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


Status
Not open for further replies.
Dave: The Purina structure is the oldest surviving structure I own. Believe it dates back to the late 70s. It's been subjectto wear and tear, and even has "replacement" windows and doors. Some of the mods and add ons were based on Reed and Perrine, of Tennant, NJ on the Freehold Secondary. When we switched them, I never had to buy lawn fertilizer. They would leave bags on the outbound cars. BTW, your old layout was very nice.

2022 - 2023 tax bill
came today. Rough estimate is that it went up $1000.00 from last year. Now, maybe, I will qualify for Jersey's Senior Tax Freeze...
Talked to PHIL yesterday! Can't seem to get him back on the forum; he said that he just no longer has an interest and that the garage is either too hot, or too cold for him to do anything with the layout.
Sherrel: Sorry to hear that, but I completely understand. When one is not feeling well, one doesn't want to do anything.
 
When I was growing up, our next door neighbor was a mechanical engineer who helped Scotts develop the first walk behind drop spreader. He could fix or fabricate anything, and had a basement full of shop tools, and was always using micrometers, calipers, you name it...

One day, when I was older (in my teens) he made an off-color joke that has stuck with me over the years. I asked him which of his tools can measure the finest distances... I used the word "fine" rather than "precise," or "smallest"...

his answer was that a red female pubic hair is the finest measurement known to man. There may be more precise measurements, but none finer than a red pubic hair.

Although... I find it harder and harder to share that story without offending someone. So, I'll share it here. 🤣🤪
Jeff,

On one of my first jobs working in Casper, Wyoming; my boss used that term all the time. He would fit it into many sentences still not sure what he was getting at. I think he would say "dumber than a red pubic hair" or something on that order.

Really stuck in my head, here I am almost 50 years later recounting the story. By the way, he was one of the best 2 bosses I have ever had. I can even remember his name, Marion Matthews. My dad's middle name was Marion so maybe helped me remember.

Dave
 
Hi All. The next week is 50% chance of storms, daily, with highs in high 80s and lows around 68-70. It will keep the concrete from curing to quickly so should be good except we need to start taking down bracing etc on Saturday after my dad's funeral and the various family get togethers. My brother will be up from Arizona and said he can help.

My day job gave me 3 days "bereavement" time off, though I will use some of it to actually do a little day job work so I can comp-time it next week when I need it. But it made it easy to be away from the desk yesterday with the concrete pour.

This morning I slept in a bit. Was tired from all that has been happening this week. In addition, my son went this morning to get his wisdom teeth out (I still have 3 of 4 of mine -- perhaps why I am so "wise"!!). Wife called and said they are done but son is still kind of in twilight zone from the sedation.

Yesterday we did the pour, as I mentioned, after all the delays. I had sent the job super that is helping me the concrete details last week and I also forwarded them to the owner of the company that is actually hired to do the pour (they also dug the hole last year and did the footings). There was a quote from the ICF installation manual that for 8" and 10" walls aggregate up to 19mm (3/4" more or less) was OK, but because I had been told by a couple really experienced people to only use pea gravel in the concrete due to all the narrow steel crevices at I had explicitly called out "pea gravel" after quoting from the instruction manual (I quoted from that as it had a ton more important bits than just the gravel). Despite me explicitly calling out that we needed "pea gravel" the first load showed up with the larger 3/4" aggregate. I quickly called and the company owner was able to switch but the first 2-3 trucks were the larger gravel before they were able to get pea gravel mix.

The crew also showed up without a concrete vibrator. I called the super and they called the company owner who called me and said they were going to rent one. He showed up with one borrowed from a friend who does ICF homes -- it attaches to the top of the rebar and heavily vibrates the whole bar. That worked for about 2/3 or 3/4 of the day before it went kaputt. They also had a whip one they had rented which they used to finish. I am not sure they vibrated as much as they should have but they did go around a few times. Depending on what area.

As I posted earlier they had set up forms for a retaining wall for the rear basement walk-out stairs. They decided to try and use the larger aggregate concrete in that and started to fill it up but since it was tied to the house and abutted the house walls, which were empty of concrete at this point, it started to push against the wall and dislodged the one corner about 1.5 or two inches in. They also had a blowout where the wall had been pushed and the form no longer touched the wall. They quickly tried to stem the blowout and stopped putting more in. They blocked the blowout space and we figured out what/why was happening. If we had =thought about it a moment before we tried to fill the retaining wall without the house wall at the same time we could have avoided that. Overall it is not a huge deal as it is all below grade and we needed to put a false wall for the bathroom in anyway right whee the wall is dislodged a bit.

The way you are supposed to do ICF is go all around your forms --- the whole house -- and do about 3'. That gives the concrete time to set before you get around and start the second layer. And it reduces the liquid pressures on the wall. But because of this retaining wall they wanted to just fill that house wall it was attached to. I was not too happy about it but it worked in the end. No blowouts or anything in that wall.

Then they started to do the 3' but not around the whole house. They did a wall and around part of the garage (they did the long garage and a rear wall) and then they went and did another layer and then another. They kind of did each section completely before going to the next, but they did 3' at a time. But not enough time to set first. The vibrating crew did get around a couple times.

Anyway in the end it worked out and there was only one other blowout, and it was minor and was my fault. On the first layer, on a mixed size corner I had to constrcut from two different corner pieces, I had to insert a 2" wide piece of foam. I meant to add a bracing board over it to keep it in when poured but forgot to add it last Fall (this was on the very first row). So it popped out when they started to put the concrete in. One of the crew was there when it happened so he grabbed a 2x4 and blocked it and called me over. I had cut some 16" x 18" or so "blowout" boards from plywood and quickly placed one over the whole (the crew guy had pushed the foam back in the whole as well) and screwed it into place so it was minor.

Saturday I'll start to take the bracing down etc as long as it is not raining too hard. Don't know if the son will be up to helping, having just gotten home 15 min ago from the oral surgeon, but the brother can help he said...

I did get a call Tuesday from the guy I had rented my previous bracing from, before I bought my own, and he wanted to know if I'd be interested in renting mine out for a month before I need it again. So I will hopefully be able to do that.


68184482183__BA199B5D-27D2-479F-B58D-E856F07CE13A.jpegIMG_5898.jpegIMG_5896.jpegIMG_5891.jpegIMG_5886.jpegIMG_5882.jpegIMG_5881.jpegIMG_5880.jpegIMG_5878.jpegIMG_5875.jpeg
 
Last edited:


I think I'm losing my mind.
I placed an order for an ESU decoder tester this morning.
Just half an hour ago, I went to the mailbox and there was a box. The ESU decoder tester.
Dang, that was fast. Ummmmm, wait a minute. This was ordered on 3 Aug. Oh, dang, I did place my order back then.
Called up the vender, waved my senility flag and got the order that I placed today cancelled.
 
I think I'm losing my mind.
I placed an order for an ESU decoder tester this morning.
Just half an hour ago, I went to the mailbox and there was a box. The ESU decoder tester.
Dang, that was fast. Ummmmm, wait a minute. This was ordered on 3 Aug. Oh, dang, I did place my order back then.
Called up the vender, waved my senility flag and got the order that I placed today cancelled.

Yeah, I've done that sort of thing. But just remember "two is one, and one is none".

I actually ended up with an ESU and a Zimo decoder testers. On purpose. For some reason I don't remember.
 
Afternoon all. Today is dog washing day. Fortunately, he doesn't seem to mind and stands there. We are using a medicated shampoo and it requires you soak for 10 to 15 minutes before rinsing. Trying to clear a skin condition.
While Willie got 1.6 inches of rain, we didn't get much, barely hit the first mark on the rain gauge. The weather people were going bananas about the front coming in with 60 mph wind 600 ground to cloud lightening and some 34,000 already without power. I'll give you it did look ominous but what a fizzle.
1660239501276.jpeg

I got the parts for Keystone Mill yesterday, well sort of. One of the carriers had an incomplete laser cut. So now I'm waiting for a new card.
I will give rslaser credit for standing behind their product.

STAY SAFE

LATER
 
Afternoon All,

Ran errands with the wife then glued down the roadway and parking lot. The freight house showed up today. I'll paint it in buff with chocolate brown trim. Tomorrow I'll put down the basic ground cover around it before starting on the kit this weekend.

Thank you for the photo likes yesterday.

Chet- Thank you. Great layout shots.

Joe- Thank you. You have a lot of switching opportunities on your layout.

TomO- Sounds like you're not having food.

Willie- Nice scene. I don't remember seeing it before.

Sherrel- We talk almost every week. He has to deal with low energy levels.

Dave- Great layout shots.

Chad- You are making a lot of progress on the house.

layout120.jpg

layout121.jpg

layout122.jpg

layout123.jpg

layout124.jpg

I hope everyone has a good night.
 
Hi All. The next week is 50% chance of storms, daily, with highs in high 80s and lows around 68-70. It will keep the concrete from curing to quickly so should be good except we need to start taking down bracing etc on Saturday after my dad's funeral and the various family get togethers. My brother will be up from Arizona and said he can help.

My day job gave me 3 days "bereavement" time off, though I will use some of it to actually do a little day job work so I can comp-time it next week when I need it. But it made it easy to be away from the desk yesterday with the concrete pour.

This morning I slept in a bit. Was tired from all that has been happening this week. In addition, my son went this morning to get his wisdom teeth out (I still have 3 of 4 of mine -- perhaps why I am so "wise"!!). Wife called and said they are done but son is still kind of in twilight zone from the sedation.

Yesterday we did the pour, as I mentioned, after all the delays. I had sent the job super that is helping me the concrete details last week and I also forwarded them to the owner of the company that is actually hired to do the pour (they also dug the hole last year and did the footings). There was a quote from the ICF installation manual that for 8" and 10" walls aggregate up to 19mm (3/4" more or less) was OK, but because I had been told by a couple really experienced people to only use pea gravel in the concrete due to all the narrow steel crevices at I had explicitly called out "pea gravel" after quoting from the instruction manual (I quoted from that as it had a ton more important bits than just the gravel). Despite me explicitly calling out that we needed "pea gravel" the first load showed up with the larger 3/4" aggregate. I quickly called and the company owner was able to switch but the first 2-3 trucks were the larger gravel before they were able to get pea gravel mix.

The crew also showed up without a concrete vibrator. I called the super and they called the company owner who called me and said they were going to rent one. He showed up with one borrowed from a friend who does ICF homes -- it attaches to the top of the rebar and heavily vibrates the whole bar. That worked for about 2/3 or 3/4 of the day before it went kaputt. They also had a whip one they had rented which they used to finish. I am not sure they vibrated as much as they should have but they did go around a few times. Depending on what area.

As I posted earlier they had set up forms for a retaining wall for the rear basement walk-out stairs. They decided to try and use the larger aggregate concrete in that and started to fill it up but since it was tied to the house and abutted the house walls, which were empty of concrete at this point, it started to push against the wall and dislodged the one corner about 1.5 or two inches in. They also had a blowout where the wall had been pushed and the form no longer touched the wall. They quickly tried to stem the blowout and stopped putting more in. They blocked the blowout space and we figured out what/why was happening. If we had =thought about it a moment before we tried to fill the retaining wall without the house wall at the same time we could have avoided that. Overall it is not a huge deal as it is all below grade and we needed to put a false wall for the bathroom in anyway right whee the wall is dislodged a bit.

The way you are supposed to do ICF is go all around your forms --- the whole house -- and do about 3'. That gives the concrete time to set before you get around and start the second layer. And it reduces the liquid pressures on the wall. But because of this retaining wall they wanted to just fill that house wall it was attached to. I was not too happy about it but it worked in the end. No blowouts or anything in that wall.

Then they started to do the 3' but not around the whole house. They did a wall and around part of the garage (they did the long garage and a rear wall) and then they went and did another layer and then another. They kind of did each section completely before going to the next, but they did 3' at a time. But not enough time to set first. The vibrating crew did get around a couple times.

Anyway in the end it worked out and there was only one other blowout, and it was minor and was my fault. On the first layer, on a mixed size corner I had to constrcut from two different corner pieces, I had to insert a 2" wide piece of foam. I meant to add a bracing board over it to keep it in when poured but forgot to add it last Fall (this was on the very first row). So it popped out when they started to put the concrete in. One of the crew was there when it happened so he grabbed a 2x4 and blocked it and called me over. I had cut some 16" x 18" or so "blowout" boards from plywood and quickly placed one over the whole (the crew guy had pushed the foam back in the whole as well) and screwed it into place so it was minor.

Saturday I'll start to take the bracing down etc as long as it is not raining too hard. Don't know if the son will be up to helping, having just gotten home 15 min ago from the oral surgeon, but the brother can help he said...

I did get a call Tuesday from the guy I had rented my previous bracing from, before I bought my own, and he wanted to know if I'd be interested in renting mine out for a month before I need it again. So I will hopefully be able to do that.


View attachment 149944View attachment 149945View attachment 149947View attachment 149948View attachment 149949View attachment 149951View attachment 149952View attachment 149953View attachment 149954View attachment 149955
Hard to believe they showed up without a vibrator! Seeing the pump truck brings back memories when I tested concrete, however on commercial jobs we usually just poured footings and walls came in big concrete sections they placed with a crane.

Great only one blowout! You must feel somewhat anxious to get er done (I do and I am just looking at the pics)!!

Dave
 
Just received the results of Tuesday's blood draw, which included Comprehensive Metabolic and Lipid panels. Everything was in range for the first time in 17 years that I have been seeing this doctor!:):):) All of the things that I compare from visit to visit; Glucose level = 79, Cholesterol = 143, Triglycerides = 94, HDL = 44 and LDL = 81. Creatinine which my wife says is important is at 1.01. Lots of other things there that I don't understand or care about were all in range as well. No A1c was done since the interval from the most recent test has not been long enough for Medicare to pay for, but with glucose at 79, I should still be good at 5.6.
All great news so I should celebrate with an extra beer tonight!
 


Driving by, saw the diner door open, so I thought I'd drop in.

Willie - great news. I go next month, hope I do as well.
Joe - liking your layout. If I ever have to redo my layout, I think I'm going to go the switching layout route.

Today was steamer day. all the SD40-2 are removed and only Steam locos are run. RS-3 are in roundhouse.
1660251788188.jpeg


STAY SAFE
LATER
 
Afternoon All,

Ran errands with the wife then glued down the roadway and parking lot. The freight house showed up today. I'll paint it in buff with chocolate brown trim. Tomorrow I'll put down the basic ground cover around it before starting on the kit this weekend.

Thank you for the photo likes yesterday.

Chet- Thank you. Great layout shots.

Joe- Thank you. You have a lot of switching opportunities on your layout.

TomO- Sounds like you're not having food.

Willie- Nice scene. I don't remember seeing it before.

Sherrel- We talk almost every week. He has to deal with low energy levels.

Dave- Great layout shots.

Chad- You are making a lot of progress on the house.

View attachment 149957

View attachment 149958

View attachment 149959

View attachment 149960

View attachment 149961

I hope everyone has a good night.
Curt: That looks like the Freight House sold by Micro Mark. The one located on the Schuylkill Branch. Going to work well with your layout. Crossing and lot look good.
 
The op session is starting to take a recognizable shape.
Got the intermodal area cleaned up or organized.

20220811_141913.jpg


Got 4 trains assembled with Way Bills and Train Orders.

20220811_211058.jpg


Still have to set up the freight cars in the industries then mark each train order of what they have to pick up at each industry. The coal facility will have a few unit trains to move through the Balfour yard then to the Barstow Power plant.
Lastly, the staging yard setup. I have room down there for 7 trains. One track has to stay open to receive a train then the loco picks up one of the trains from staging for transfer back up to the Balfour yard.
The timing of the op session is an up and coming facet of the op session. Past sessions were run in a fashion of just do it. I'm looking into using a fast clock to keep things moving but I have to know how long each activity takes.
The Digitrax throttles have a fast clock feature which I'll start looking at.
 


Status
Not open for further replies.




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)