ModelRailroadForums.com is a free
Model Railroad Discussion Forum and
photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.
Well-Known Member
Staff member
In the words of J "Hanniball" Smith, "I love it when a plan comes together".
Wow, looks great! Coming along nicely.
Thanks Gents so here is how it looks from start to finish at the moment, not withstanding the mess all over the bench work:
Some track work was redone for better radius and a smoother flow of things. Waiting now for my Track Alignment Gauges to arrive (16"/17"/18") so I can complete the track work and get this all joined up.
Tony,
I may be reading the plan vs track laying. How are you going to do the elevations? Are you going to use some kind of a roadbed?
Mike,
The sub roadbed is cut out of the ply about an inch wider either side of the track work. That is raised using "risers", in my case lengths of 1 X 4. The risers are attached to the bench work framing every 12 or so inches and lift the ply (sub roadbed) to form the grade:
I then use cork road bed on top of the sub roadbed.
Never worry about a mess. Thats a standard in the first stages....sometimes in the second and third....

... and the fourth and fifth and ...

Mike, this probably shows what I am going to be doing, the type of bench work I will be adopting, more clearly:
Tony,
That sums it up perfectly. Now it makes perfect sense.
Looks good! Going to add road bed? Cookie cutter?
Ahh yep - both. Cork roadbed and using the cookie cutter method as per the above picture

Great progress, all the mess means you’ve been busy.
Glad to see you doing it that way, Tony. That's the best kind of layout skeleton.
Thanks gents and your right Edsland - if you've got time to keep things clean, your not doing enough work
Sherrel, agreed - it makes doing everything easier, especially the wiring and getting the grades "spot on" (hopefully).
Track work is completed, now time to cut the ply, install the risers, do the wiring and keep my fingers crossed it all works:
Well-Known Member
Staff member
if you've got time to keep things clean, your not doing enough work
I must be doing lots of work then Tony, my workbench looks more like your shelf above the layout. My last photos show a working space of about 12" x 12".
I must be as well ... I managed to transform the nice neat and tidy bench work into another mess!!
That being said, it was for a very good cause as now I have enough of my ground level risers in place and am ready to cut out the sub roadbed.
"Ground Level" is 1.5" above the framework hieght.
shapping up nicely, looking forward to the landscaping
Thank you but now the hard part for me comes - cutting out the sub roadbed

Got a little more done to the sub roadbed and have starting putting in the joint bracing as follows:
The screw is only there until the glue dries properly, probably 24 hours for a good strong bond.
Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website
(Learn More Here)