rising from the termites

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


NVSrr1500

Well-Known Member
Now with the termites vanquished, out of the ashes is starting to rise a new empire. Large port, urban area, decent yard. all modern era. large lift bridges. both being at least 3 feet long. The track plan concept is laid out. as I am building the benchwork, I have seen places to change it already. long before getting anything laid out on wood. That why track plans are guides and not definite. unless it was already build layout.
 
I am down to 4 pieces left to strip down. Hopefullyget them done this weekend. Then I can start on putting pencil to wood. figure out exactly how this plan will sit and changes. Also means all these building get put back on the layout to help with that layout of the plan. Also helps with creating the planning of the sizes of the other woodpeaces needed.
 




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top