Realigning Established Track

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


Well, the project was a complete success. The problem child engine does not derail at all. Another one of my GEVOs does now, but at a scale speed of about 80 mph. (At a switch, a Peco curved switch where the through path has a 36” radius, the branch 18”)

My previous limit was about 35-40 mph.

Prototypical track speed in the region I’ve modeled (C&O mainline & a branch line, on the New River in West Virginia) would likely be 35 mph tops, less in some areas.

So, I’m good to go.
 


I’m already at the sweet spot, I think.
That switch is at the exit of my tunnel. I’m not going to be inviting in-tunnel derailments by running through said tunnel at ~80mph
smirk!!! When friends bring their kids over to see the layout, the kids want the trains to run faster. I usually tell em this isn't a slot car track and the trains are too expensive to go tumbling to the floor for entertainment.
I've got all my locos speed matched for a maximum 72MPH. Kinda boring for kids.
 
I've got all my locos speed matched for a maximum 72MPH. Kinda boring for kids.

I have my lashup of ET44s/ES44s set up to top out around 90. That way, if I ever build a layout that cuts through the plains of the American Midwest, I’ll be ready.

But for now, the plan is to just hide ‘em on a staging siding under a mountain, and roll ‘em out just once in a while, at track speed as they creep around the mountain and along the riverbank.

For my Y6b, I’ve got it set to top out around 60.
 




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top