I am posting 3 pics of a 4x8 layout. I am using SCARM software. This layout gives me 2 long parallel mainlines to run freight/passenger trains. It also gives me an elevated track that can service some small rural industries. The upper track is isolated from the 2 lower parallel mainlines. I didn't want to bother with the up/down slope to tie the tracks together.....this is a decision that I made on purpose.....I want to be able to run the lower trains while operating the upper train without any worry of "blocking the main", etc....
