ModelRailroadForums.com is a free
Model Railroad Discussion Forum and
photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.
Taking shape nicely

It is coming along nicely. Once a bit of scenery gets started, it makes so much difference. Looking forward to updates. Nice work.
Thanks guys, just finishing up a portal and retaining wall and I'm going to start laying some rockwork.
I wasn't happy with the way this area was going so decided to work in a deep slow moving river which will flow into the port.
After roughing in river base I filled in over the rock which the river will flow from .
And plaster clothed in the banks using glued cardboard strips and basicly crumpled up newspaper or what ever was handy.
Going to be a fantastic scenec
Sent from my LG-D852 using Tapatalk
Lynn , I think that will look great once it all come together there.
Mike
I really like the way it is looking now. What did you use to seal the riverbed with and you think it will keep the wet water you add later from running out?
Dave
A bit more of the progress, rock molds applied and I used a brown wash which will mark the locations that vegetation will grow. After the brown wash I applied ground goop and some fine sand/gravel.
My 5 gallon supply of brown latex paint.
Wash made up
The goop
Very nice Lynn
That goop looks disgusting, but I'm sure it going to do the trick.
What's your recipe for the goop already...........I forgot
Thanks Lloyd , goop is 1-cup Celluclay or scuptamold
1-cup Vermiculate
1-cup flat latex paint - earth color
2/3-cup Elmer's white glue or 1/2 cup seems to be enough
I capful /jigger of Lysol Concentrate - disinfectant
Water as needed
Store in airtight container
When I make a batch I will start with 4 cups across the board and add equally.
Still have some work to go but I think I have a good start.
I also tried a couple trees I had kicking around.
I also tried the portal and retaining wall for fit, going to need some work and possibly retaining wall needs shortening.
You did it again beautiful work!
I wish I could make progress as quickly as you do. It's looking really good and I'm waiting for the water installment.
Excellent progress on the scene. It really is coming together
Sent from my LG-D852 using Tapatalk
Really like you rock work. Well done. Guess you can teach an old dog new tricks.
Thanks guys for the vote of confidence. I do tend to struggle at times trying to make proper decisions. And Chet yes, old dogs can be taught new tricks.

I wish I could make progress as quickly as you do. It's looking really good and I'm waiting for the water installment.
Rick its got to be the total package before I can do the water installment and as of today I'm not sure how I'm going to do the water. Total package meaning Boat Repair needs to be permanent as well as my next installment will show a new bridge I made be put in etc etc etc .
I got the industry track in place and glued down via ground goop.
Started on the river system with rocks and ground goop
and filled in behind area where boat repair will go.
and track out to valance
Catching up with where I'm at , sorry about the poor pic quality
This is the new bridge I built
and with the nbw's and supports
and cutaway for bridge , the blocks will be used for the brick work
I'm using ME bridge track
You can get the idea with this pic
And in place , this is the first time I've used scuptamold, sure is nice , also learned I can used my earth coloured paint watered down to colour the scuptamold
Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website
(Learn More Here)