ctclibby
Well-Known Member
Bob: That should work just fine. Do have a question: Are you planning on just cutting 3 1/2" blocks to go between the levels; except for the 1st and last ramp? Or, are you going to do an upright @ 90 degrees from the base and attach the ramps to that?. 1st gives you a 'leaner' , 2nd is straight up/down. Either should work, depends on what you want. Do note though if you use the 3 1/2 block method, check your inside radii so you don't hit the blocks because of underhang.Had a friend send me this. As per my last reply, I’m thinking of building my helix this way. Using excel, all my calculations are figured. I think I like this! Like always. I’ll build my prototype out of cardboard board first. What do you think?View attachment 208068
I decided on 30 degree arc's as my initial math said I could cut those in my laser cutter. Woops, didn't fit in the cutter as I forgot about the actual cutting area of the thing and just measured the inside of it. Ya, I know, sometimes I am st00pid. Fixed that with a new cutter and now I may be able to cut 45 degree arc's. If not, 30 degree arc's still work. My uprights will be 90 degrees from the base with holes in them for the ramp connections at my % grade.
Fun stuff, isn't it?
Later
