Challenger
Member
I recently dismantled and removed my 1st HO layout and am planning to rebuild it with modifications to the benchwork based on lessons learned from that first layout. Attached is a photo from the 1st layout. For my 2nd layout, I plan to attach track directly to foam. No cork roadbed. My plan is this: Screw 1/4" plywood to the top of the open-grid benchwork. Glue a sheet of 1" foam core insulation on top of the 1/4" plywood. Finally, glue a 2nd sheet of 1/4" plywood on top of the foam core. Glue and spike the track to the top layer of plywood. This is my reasoning: (1) I used 3/4" plywood as the base of my 1st layout. Overkill. I want my 2nd layout to be as lightweight as possible while at the same time providing a solid base. (2) I am adding the 1/4" plywood on top of the foam because I am afraid that spiking ties directly to the foam could compress the foam, causing undulations. (3) When spiking the track to the top layer of plywood, I plan to drill a pilot hole through the tie, spike the tie and then add a small drop of super glue to the top of the spike. One of my concerns has to do with glueing the top layer of plywood to the foam core. I'm not sure I trust that the plywood won't separate from the foam core over time. How can I address that concern? Does my plan make any sense at all? Am I overthinking this? Any thoughts, concerns, suggestions will be greatly appreciated. Thanks in advance.
