Ok so made a little progress this week, but also had to go backwards a bit. lol
Started the Blower house. Pretty easy, should be done on Tuesday as I just need to add stairs and stacks.
Also between letting the paint dry on the blower house parts I have been running some trains and testing the track. I have no problems with any of my rolling stock up to 82' auto-racks and big power on my outside mainline other then a few points that needed to be filed a bit.
BUT
When it comes to the branch lines by where my cement and Engine yard is I have some big problems. All my cement hoppers, 60' box and flats, and big power have no problems which is good cause this is what this branch should only see. Then I thought well I should test some of my longer rolling stock. 82' auto racks worked, but just! Then I got out my container cars and Maxi's. The single containers are iffy just like the auto racks, but the Maxi's derailed all over the place. lol
So I had to rip up some curves and remove/relocate some crossovers, and move my program track.
Now I am going to have 22'' on the ''mainline'' of the branch and not going to worry about the 18'' on the rest of the table as only small hoppers and switchers will be using that.
So with that being said that has opened up a bit of realestate. I am thinking of getting the Walther's Diesel shop thats on sale right now, and having it as the back shop for major repairs. Might make it a bit congested?
The cardboard is the footprint of the shop.
One of the crossover's that needs to be relocated so I can have 22'' come around the machine shop. My program track is just around the curve which will have to be relocated to the other side of the tracks by the turntable.
Middle track is the branch-main. Never noticed the kink untill the maxi's went thru. Will have to move back the turnout to smooth out the curve.