dmeephd
Modelleisenbahner1955
Nearly finished is a kitbash combining two of the old Walthers Bascule Bridges into a dual-track bridge, not unlike one located in the Netherlands near Zeebrugge.
The bridge is massive, and will require gearing and a motor much more stout than that supplied with the kits. Calculations indicate that about 10 oz. of ballast weight will have to be added into the models "concrete" counterweights. Shinohara Code 100 Bridge track will be laid down next, complete with Peco stud strips because this is going on a Maerklin Digital layout which is of course, AC with middle stub contacts acting as the 'third' rail.
There was little modification required; alternate pairings of the inside halves of the side structure were assembled together, producing the necessary slots for mounting the substructure. (It was almost as if Heljan had this in mind when tooling the molds.)
Comments would be appreciated for my first posting of what's on my workbench. When it gets warm again, I'll get it outside for some natural lighting shots.
David Martin, Ph.D.
The bridge is massive, and will require gearing and a motor much more stout than that supplied with the kits. Calculations indicate that about 10 oz. of ballast weight will have to be added into the models "concrete" counterweights. Shinohara Code 100 Bridge track will be laid down next, complete with Peco stud strips because this is going on a Maerklin Digital layout which is of course, AC with middle stub contacts acting as the 'third' rail.
There was little modification required; alternate pairings of the inside halves of the side structure were assembled together, producing the necessary slots for mounting the substructure. (It was almost as if Heljan had this in mind when tooling the molds.)
Comments would be appreciated for my first posting of what's on my workbench. When it gets warm again, I'll get it outside for some natural lighting shots.
David Martin, Ph.D.
