John from Indiana
Well-Known Member
I build this annex to my layout about 10 years ago and just recently I have put structures along the back wall and laid a little temporary track along the front of the annex. The buildings along the wall are supplied with track. Problem is; the OPEN SPACE. I find that I have to fill it up with any clutter than I can find. Any project that I start, all the stuff winds up there. I have plans for this area and the buildings that are to go in there are BIG and take up a lot of space; plus there is a mountain going into the left hand end of the annex (out of sight). I cannot control myself. Any empty space, and any area that I can put a cardboard box over to create space is used...oh; and I don't put things up, and I work on several projects at one time on the 16x22 foot layout. I can't be the only one alone in this. I keep telling myself it's only temporary, and then I go to another end of the layout and do the same thing.
