ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.
It will also be the programmable track and testing track. At the other end of the bench work, (with time) it will be a dispatcher's corner (computer corner).
I always like a direct route from the work bench to the layout. Any time one must pick up a piece of equipment it is in danger of getting broken / warped / etc.
The helix looks really good LLoyd . The train runs very smoothly both forward and backward. On a different note , 2 days ago Trainworld had some Atlas gold DCC w/ sound RS-3's decorated for the Canadian pacific .
Thanks for the heads up Jim, but I do have an RS-3 but from Bachman
I always show the same locomotive but I do have 24 more CP's which are still in their boxes
Hope to make a video of all of them in the very near future
Lloyd - Looks like you have been busy. The helix looks really good and seems to run flawlessly. That's good as it will minimize those trips under the 24" lower level if/when something doesn't act good. I too like the direct track to the workbench and I have always incorporated one in my layouts.
Been busy with my helix. I can say that the the construction is done and the only thing left is the wiring. I've put sidings to prevent trains to fall off. I had a test run on both track, forward and backwards at slow and fast speed and it's been a success.
This view, the train will be going or coming to/from Montreal (staging)
This view, the train will be going or coming to/from Ottawa (staging)
I started working on the frame work for the beginning of the Hawkesbury yard
Beginning to look a lot like..................... a huge layout
Yes Dave, it's quite an undertaking, hope to have all my tracks installed by the end of the year. I still have to build the rest of the layout which is about 20' by 15' with 2 levels.
Still busy working on the layout. In this picture you can see I started working on the framework of the staging area at the 24" level.
Now that the helix is almost finished (wiring still not done), I've been working on the peninsula framework. You can also see the depth of the layout which is about 42 feet in the next 2 pictures.
Here, I started working on laying tracks in the Hawkesbury yard. You can also see on the walls, 2 pieces that are attached which will support my brewery industry. The area for the brewery is about 7' by 7', it's going to be HUGE.
I continue working on buildings for the industries. Here you can see a refinery area and a propane area. Much more to come for those 2 industries
That's it for now
Comments and questions are welcome
Later
Wow Lloyd , when it is finished it will be one for the magazines , I am sure . It looks like you are making the most of all the room you have ( yes I am jealous!!! ) When track work is complete how much mainline do you figure you will have ?
I am STILL amazed by your layout and it really will be one for the mags. I am a little surprised though, only 170' of mainline track, it looks a whole lot bigger than that. Mind you, 170' is a darn lot of track.
Lloyd, very nice and super tidy work!!! This photos are a great inspiration for my next permanent layout.
Apologies if what i ask was mentioned earlier, but the vertical posts that go from the floor all the way up to supporting the valance, what are their dimensions (width - depth). Is it pine?
Lloyd - Nice progress on the layout. I can't believe that you only started 9 or 10 months ago. For me, benchwork, wiring, track and ballast go rather quickly; scenery takes me forever!