Hawks NEW "MHO Junction" layout

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


While waiting for switches to arrive, I've started working on designing and building my paper mill buildings.
I've also did some details such as rolls of paper and bails of recycle paper. The final look of the recycle paper bails were changed to have only to straps and done to size (what some people would call "Prototypical".....lol)
I also did the roofs with fine ballast.
So much more to do.
Later


View attachment 194836

View attachment 194837

View attachment 194838

View attachment 194839

View attachment 194840

View attachment 194841
Saw those bales the other day on MRH forums and thought I had responded, those are super
 
As I read about the paper mill, I am reminded of your post back on page #2 in 2015!

You're coming up on the 9 year anniversary soon. I wasn't commenting on posts back then because I was still in the working class and didn't have much time, but I have been following you since the beginning.
Thanks Willie,
I lied on that post...lol
I will have to add another 10 years.
Now, my goal is to have my first full size operation session around Nov 22nd, 2025 which will be 10 years since I started.
I have to blame the rabbit holes for the delay.
 


Break time on the buildings.
I will be getting my missing switch on Monday so I can complete the track work. For now, it's under the layout doing some wiring, testing the tracks and painting them.

IMG_2737.JPG


IMG_2738.JPG


IMG_2739.JPG
 
Wow, it's been almost 6 months since my last post, so I'll try to make a short resume.
First, I've been cruising in October and January and spend time in Texas visiting my brother and 6 layouts. I also visited friends in Palm Desert and visited the Coachella Valley Model railroad.
Now as for my layout, since my last post in August, this is what as been done.:

September, I prepared and gave a clinic to our NMRA division on different material to use for buildings, such as wood, hydrocal, card stock and plastic. Not much was done on the layout except that I started working on a crew lounge, which I hope to have finish by August 2025, in time for my first operating session in November.

IMG_2788.JPG


This will be the future 10' x 14' crew lounge

IMG_2811.JPG


October, before leaving on vacation, I had 10 people visit my layout in two shifts on a Saturday,.

IMG_20240921_150809.jpg


November, I did some work on my paper mill street.
Lance Mindheim posted on his blog about a method which made my life easier, since I'm not a paint artist. It was all about using pictures and not only for streets but also buildings. He also wrote an article in MRH in January 2012.
Basically, it's pictures of a streets, manipulated in Photoshop, printed on matte photo paper and glued to styrene with double sided tape, weathering will come later.

IMG_3404.JPG


December, I invited people for a "working Christmas party". Five people came over, some did 2 and 3 hour driving, we had lots of fun. Besides work, food was served and I was the "gofer", you know, go for this and go for that. On the agenda was demolition, electrical, layout wiring and track problem solving.

IMG_3385.JPG


IMG_3383.JPG


January was a cruise vacation before real work (real job) which is my two biggest month of the year, but still manage to do something different than my layout. I've built two Free-Mo modules that will have a street running and I practice to do model street running. The modules have folding legs and adjustable legs that can be set from 43" to 54".

IMG_3430.JPG


IMG_3432.JPG


This will be the looks of my street running.

IMG_3504.JPG


IMG_3509.JPG


Sorry, for this long post, but it's been almost 6 months, I'll try to post more often.
No vacation until November, I need to get lots done before my first operating session.
That is how I'll celebrate 10 years in this hobby.

Later
Lloyd
 


One more wall to go, but I need to do my track work to locate the building and then do the last wall.
For now two more walls done and the detail work as started, such as the window sills, the iron bracket holding up the bricks above the openings and the small details.

IMG_3559.JPG


IMG_3561.JPG
 






Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top