Guilford Railman
Well-Known Member
While the prototype does have a runaround in that location, James Hilton and I decided to exclude it and simply use the Bellows Falls runaround for operations if need be. We figured a runaround on 3 of the four layout sides would look kinda funky.Another note: You might think about adding a cross-over on the right side somewhere near the 1st from the bottom 'Leg' label. That would give you a 'run-around' track for that location. IE. If running clockwise, you have 4 facing point, and 10 trailing point switches; if I counted right: only on the 1st cuppa joe so far. In fact, if you could get those 2 top ladder tracks connected back into the main without much trouble, you would not have to back into them for storage/whatever.
Has this layout been done with any track-laying software? I don't remember seeing that - if not, you might give that a go to check the curve and switch fitting with what the illustration shows.
It is amazing what you learn about MRR when you decide 'just do it' isn't it? At least you are reading about it whereas some of the others ( me included ) just started building .. then re-building .. Ad-Yawn.
In terms of the yard tracks, the prototype has 2 or 3 yard tracks in a similar configuration to how it is shown on the layout plan. The single runaround there will definitely suffice for operations
To answer your question regarding a software track plan, James sent that to me first before sketching the layout. I included it in an earlier post. I believe he uses Anyrail but I could be wrong.
The reading definitely helps! Up until this point, I’ve done what you’ve stated for every project; simply build and repeat. It can certainly be helpful to learn from one’s own mistakes but in model railroading, quite costly too haha. Figured I’d better shift my costs to resources for enhancing my building techniques with confirmed good results behind them haha.
