Guilford Railman
Well-Known Member
Update time!!!
Not a ton of progress to report but progress nonetheless!
I soldered all the feeders to the rails over the last couple days and used heat shrink tubes for the wires between the power track feeder ties and the wires themselves.
Soldering the feeders was big on the to-do list so that I could continue with wiring. I will go around and clean up the soldering a bit with a mini dremel and sanding wheel some point later on.
I also soldered the PCB ties to the lift gate track.
My plan is to solder guard rails on top of the PCB ties as well. Here’s an example of what that’ll look like:
It’ll only be soldered to the track on the right half of the image so the track can lift up.
I also began placing the frog juicer feeder wires into the foam and down towards the bus wire.
I also used heat shrink tubes over the solder joints between the wires on the Peco turnouts and the 22 gauge feeder wire I purchased.
One issue I’ve been having is that the wires on the Peco turnouts for the frogs are VERY fragile. The wires can’t be manipulated too much otherwise the wire will snap. I’ve already had that happen once. Once these go into the foam, they need to stay there which means my methods for glueing the track and painting it will have to change. More on that later!
A few other smaller projects I completed were making the power feeder wires for the frog juicers themselves, including more heat shrink tubes around the plugs.
I used a regular lighter and some of these tubes got a little toasty lol.
One other task I completed was to spray the truss bridge with Testors dull cote. The results are much better!
I still have a few areas where the powder is caked up too much and has “crystallized” and turned white. I must have missed these areas from before. My plan is to use some vines or some kind of scenery technique or detail in the future to mask those areas.
That’s all for this week. I need to finish installing frog feeder wires and then I’ll move on to additional work with T-taps. It should just be a few more weeks and I’ll hopefully be able to test a train on the layout
Not a ton of progress to report but progress nonetheless!
I soldered all the feeders to the rails over the last couple days and used heat shrink tubes for the wires between the power track feeder ties and the wires themselves.
Soldering the feeders was big on the to-do list so that I could continue with wiring. I will go around and clean up the soldering a bit with a mini dremel and sanding wheel some point later on.
I also soldered the PCB ties to the lift gate track.
My plan is to solder guard rails on top of the PCB ties as well. Here’s an example of what that’ll look like:
It’ll only be soldered to the track on the right half of the image so the track can lift up.
I also began placing the frog juicer feeder wires into the foam and down towards the bus wire.
I also used heat shrink tubes over the solder joints between the wires on the Peco turnouts and the 22 gauge feeder wire I purchased.
One issue I’ve been having is that the wires on the Peco turnouts for the frogs are VERY fragile. The wires can’t be manipulated too much otherwise the wire will snap. I’ve already had that happen once. Once these go into the foam, they need to stay there which means my methods for glueing the track and painting it will have to change. More on that later!
A few other smaller projects I completed were making the power feeder wires for the frog juicers themselves, including more heat shrink tubes around the plugs.
I used a regular lighter and some of these tubes got a little toasty lol.
One other task I completed was to spray the truss bridge with Testors dull cote. The results are much better!
I still have a few areas where the powder is caked up too much and has “crystallized” and turned white. I must have missed these areas from before. My plan is to use some vines or some kind of scenery technique or detail in the future to mask those areas.
That’s all for this week. I need to finish installing frog feeder wires and then I’ll move on to additional work with T-taps. It should just be a few more weeks and I’ll hopefully be able to test a train on the layout