Im going to be picking up some 2" foam sheets this weekend to get them on my layout and had a question before I draw out my tack plan on the foam 100%
Im thinking about having one section of track cross another and wanted the lower track to dip down about 2-1.5" so the top track does not have to go up as high for clearance.
What/how could I cut a "valley" of sorts for the track to begin its decent?
Im thinking about having one section of track cross another and wanted the lower track to dip down about 2-1.5" so the top track does not have to go up as high for clearance.
What/how could I cut a "valley" of sorts for the track to begin its decent?
