Guys,
Our investor has wired funds to our account to start the drive injection mould tooling. I sent out the three side frames for quotation, there will still be some modification to make before production but we're trying to get the ball rolling quickly.
We have two moulds planned to tackle the side-frames and add on components.
The test samples for all of the machined components is in progress.
Attached here are test samples of the traction motor casings. This is rapid prototyped in clear plastic. We can use these to get a feel for the design. With tolerances so tight, we have to right into injection moulding.
Last week was our best yet since we started business in 2006. Please keep up the support, the hoods, fans and drive are fully funded but we still need the cash flow for loan payments, production and to fund the 4 detail orientated moulds we need to finish the first full wide cab kits.
We're going to use a second tool maker for the drive so they will be done the same time as the hoods. If all goes well, expect them sometime this spring.
All the best,
Christopher Howard
Railflyer Model Prototypes Inc.
www.railflyermodelprototypes.com
Our investor has wired funds to our account to start the drive injection mould tooling. I sent out the three side frames for quotation, there will still be some modification to make before production but we're trying to get the ball rolling quickly.
We have two moulds planned to tackle the side-frames and add on components.
The test samples for all of the machined components is in progress.
Attached here are test samples of the traction motor casings. This is rapid prototyped in clear plastic. We can use these to get a feel for the design. With tolerances so tight, we have to right into injection moulding.
Last week was our best yet since we started business in 2006. Please keep up the support, the hoods, fans and drive are fully funded but we still need the cash flow for loan payments, production and to fund the 4 detail orientated moulds we need to finish the first full wide cab kits.
We're going to use a second tool maker for the drive so they will be done the same time as the hoods. If all goes well, expect them sometime this spring.
All the best,
Christopher Howard
Railflyer Model Prototypes Inc.