We're going to have another track around the base of the mountain. So there is room for expansion.
The next set we're getting, sometime in the next year or two is this:
http://www.marklin.com/start/digital.html
set 29680, "Gotthard"
The crocodile train will run along the mountain track. He wants to get one of those contact tracks so that the crocodile will go up, stop, and then the little one we have will come up. When the little one arrives, the crocodile will go down to the valley station, wait, and then the little one arrives and they go back up. And so on so forth.
Meanwhile, the other train will be doing yet-to-be-determined things at the bottom of the track.
Eventually, when we have a house, we'll have a room or garage set aside for this and we will have lots of trains running around the bottom.
But we're not there yet. Right now, our goal is to create an interesting track for the little train we have. Preferably, involving lots of little cows and chalets.
We've been dreaming big, and thinking about a whole little miniature Switzerland... starting at Geneva with a lakeside scene, maybe with a boat, then going over a mountain into a sort of Bernese valley with the black forest type houses, which are similar to what they have in Bern, then a mountain into a central Switzerland valley with typical wooden chalets, then a mountain and a valley with the eastern Switzerland plaster-type houses. Kibri makes all these different kinds. Each little mountain would have its own little mountain train and/or gondola. And there would be trains running along the whole bottom of the valley.
Like I said, one step at a time. The particular track we are building is for small mountain trains, but our layout will be expanded to include larger valley trains. As long as the small track works for the small trains, we will be set for now. I mean, I figure it's going to take at least several months to build our small starter scene, so we've got time.