Hello there,
Since this is still relating to track in general, I thought rather not start a new thread.
But first an update: I had to pull dismantle my first ever (4'4''x 6') layout due to space needed for more storage

.
This was the layout,
Link:
http://www.modelrailroadforums.com/forum/showthread.php?t=25701
I couldn't go beyond laying track and running trains due to various reasons, including a spell of loosing interest, therefore it remained like that for the duration it was around. I did however run trains now and then and did have a good time doing so.
That said, I'm starting a new shelf layout in due time, got permission from the wife and mother (mum's house

) to drill the wall etc etc.......
The shelves will consist of 10" deep sections and some narrow 4" sections. The shelves will be plain wood planks fixed on to metal L brackets which will be fixed on to the wall.
This layout will be strictly for running trains, no scenery (may add in the future, but don't think so) due to financial restrains, time etc etc.....
Of course there will be light signals, a basic building or two and will consist of a single main line with a tiny two track yard and one spur (as planned).
Now about the track:
As I have no intention whatsoever about scenery, I don't plan to ballast the track and would just prefer to
nail down the track directly on to the wood and drill holes for the feeder wires from a buss wire.
Is it alright to do so? Would you guys advice against it? Advice would be really appreciated

.
BTW, I also want to add a Peco code 83 #5 RH turn out, is it true that the points are spring loaded and therefore the points can be moved into place with your finger without the need for a switch machine?
Thanks in advance!