After much soul searching, procrastination, bad backing, I have decided to do "one last layout." I have my wife's permission, always needed because she has the money in this household.
The theme of the layout will be mining again. But sticking to my roots, it will be primarily a 'runner' layout this time. On the current PCM&T layout you will remember I started out with just mining and operations and eventually went to a loop. I'm too broken down to go through that process again, therefore 'runner' layout first and mining secondary and only limited to two sidings at this point. The name Pinnacle Creek Mining and Timber Co. will continue with the addition of "Southern Division." Way south in fact. Location will be some mythical setting in South Western USA. I have done a desert canyon layout before and it won't look remotely close to that 'look.' Maybe I posted a photo of it here? I couldn't find it but this thread has grown so large one must have special powers to remember where the tutorial threads and photos actually are.
If you can picture reddish yellow rock formations with complimentary colors in the ground cover and part of the layout in that color combo with the conifer trees from the current layout you may get some idea of the look I'm looking for. Think Malcolm Furlow on the left side of the layout and more forest on the right side. I will have a small country station and only a few attending railroad structures. I will have an asphalt (metal) road and some vehicles. Much of the mining camp buildings will be reworked with powders to more suit this new environment and the buildings will 'age' about 20 years.
As usual wooden trestles will play an important part on this small railroad set now in about 1939. Not firm on that at this point. I will probably have to upgrade to a DCC and sound equiped 2-6-0 or 2-8-0 loco for the mainline. I hate not using all the geared steam I have, but not all of those loco types will fit on this layout this time around. I may NOT use the "cliff" trestle this time around. That's the one where the train has no where to go except the floor! I think, at this point, I've worn out all possibilities for a repeat as it has appeared on the past three layouts, so I'm not counting on it this time around. That's shown in the lower right side of the plan below.
So other than color, which is dictated by local, what is different? Well, canyons are going to be a difference. The major through the layout canyon will be pretty deep. I'm envisioning up to two feet deep at this point. Like everything else I do these kinds of decisions are made as I go and not really ahead of time. Another item is NOT having a fascia this time. Heresy you say. Maybe, but my idea is that this layout sits near, very near the edge of a more vast canyon, like where we would stand viewing or operating the layout. So visualize the fascia as sloping canyon walls, Grand Canyon like, all full of scenery. It fact there will be no really large mountains/cliffs on this layout. Relief will be more below track level than above. If this all sounds 'different' at best and 'weird' at worst then I'm happy. No one needs to see a layout made like their own or their train buddy's down the street and I don't intend to build one like that. BUT I think you all knew that already.
So there you are for now. I'm taking the summer off from softball to mend my back. Hopefully I won't hurt in on my vacation late this month. I have an Open House on August 28, after that I expect to start the new layout and in my way I will go through the steps again on how this will be done. While the PCM&T was finished in a year, I don't have quite that expectation for the Southern Division. Because I'm essentially scenicing more layout this time it can't be as fast. One last thing I'm not going to use much, if any, stucco patch this time around. I will instead use Sculptamold for rocks and cliffs.
This layout will be HO, but I will also run On30 on it. Hope you all can stick around for another go. Jim
