RavenKnight21
Member
New to forum, getting back into model railroad.
What do you think, i'll be doing a 1/4inch plywood
with 1x4 frames, 2x4 legs, and using 1inch foam
board as a base and a couple more sheets of foam
for mountains ect.
4x8 Layout, 3 loop system (insulators at each turnout),
3 rail power 1100 controllers (still running DC, it works
for me and my son) and a total of 60 feet of track for non stop action.
Outside loop freight and passenger, Helix system climbing
with a 2.9% Grade, leveling out at 5 inch's tall to a triple
atlas 18inch bridge set and a 2.69% downgrade (i know
its steep but will not be running at full speed on the outer loop.
First inside loop, passenger set and small switch trains.
Tunnel system and will be the lowest track at 0 inchs to give
depth to the layout (1.0% grade down after turnouts.
Inner loop system, switcher engines only, moving around freight
cars. Future layout will incorporate a turntable and multiple turnouts.
this track will be at the base level of the layout at .5-1 inch including
a station, warehouse ect...
Then a couple photos of some of the items i will be using.
What do you think, i'll be doing a 1/4inch plywood
with 1x4 frames, 2x4 legs, and using 1inch foam
board as a base and a couple more sheets of foam
for mountains ect.
4x8 Layout, 3 loop system (insulators at each turnout),
3 rail power 1100 controllers (still running DC, it works
for me and my son) and a total of 60 feet of track for non stop action.
Outside loop freight and passenger, Helix system climbing
with a 2.9% Grade, leveling out at 5 inch's tall to a triple
atlas 18inch bridge set and a 2.69% downgrade (i know
its steep but will not be running at full speed on the outer loop.
First inside loop, passenger set and small switch trains.
Tunnel system and will be the lowest track at 0 inchs to give
depth to the layout (1.0% grade down after turnouts.
Inner loop system, switcher engines only, moving around freight
cars. Future layout will incorporate a turntable and multiple turnouts.
this track will be at the base level of the layout at .5-1 inch including
a station, warehouse ect...
Then a couple photos of some of the items i will be using.
Last edited by a moderator:
