RE#1
Well-Known Member
Thanks for commenting. Still need to install the tower levers. The roof and second floor are removable. Also waiting for some rr signs and some switch lines that will parallel the track.Looks great and aged nice and quickly
Thanks for commenting. Still need to install the tower levers. The roof and second floor are removable. Also waiting for some rr signs and some switch lines that will parallel the track.Looks great and aged nice and quickly
Thank you for your kind words. Still needs a few more details.I'm always amazed at your patience and attention to detail, which is simply amazing. I could never build something like this to such a high standard as you routinely seem to achieve.
Excellent build, nice aging on the wood,the roof felt is spot on,maybe one rickety start? Oh and the old wood colour and little tacks plus the railway enthusiast taking a picture oh yeah a totally lovely scene. My compliments
I like the empty oil drum excellent weathering
