Search results

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


  1. conrailocs

    Painting track with Switch Throws

    Thanks! I'll do that.
  2. conrailocs

    Painting track with Switch Throws

    OK, thanks. How do you seal the powders on? Dullcote?
  3. conrailocs

    Painting track with Switch Throws

    Forum, I am satisfied with all of the track and wiring on my layout and am ready to airbrush the track. I have already installed Caboose Industries switch throws though. Can these be painted or should they be masked and left black? Thanks, conrailocs
  4. conrailocs

    Atlas Code 100 switch throws and Caboose Industries Throws?

    Thanks! I was just wondering how they attach before I order them. -conrailocs
  5. conrailocs

    Atlas Code 100 switch throws and Caboose Industries Throws?

    I read the whole thread ad examined the photos but couldn't gain any information on conecting the throw to an Atlas turnout. Could you explain what I'm missing.
  6. conrailocs

    Atlas Code 100 switch throws and Caboose Industries Throws?

    I'm using Atlas code 100 #4 turnouts for my layout. How would you suggest attaching a Caboose industries throw? I know they sell a version that has attachments. Does one of those fit or is a home-made device better for joining the two? Thanks! -conrailocs
  7. conrailocs

    Operations Wye/Yard Question

    To answer your question the locomotive coming from staging will do no switching. A yard switcher will work the yard and a separate loco will switch the industries. The branch off the the left will make sense. It goes to serve a steel mill. The area in the bottom left will contain many...
  8. conrailocs

    Operations Wye/Yard Question

    On my small train layout I am debating which way I should lay something out which will depend on how I choose to operate it. I'm looking for some advice as to what the most prototypical way to run trains would be. The layout is meant to represent the end of a branchline. I'll try to show this...
  9. conrailocs

    Turnout on a bridge?

    I was thinking that I'd use a plate girder or deck girder bridge. It would have to be scratchbuilt because no retail bridges have turnouts on them and even if they did it would be hard to find one with the right spacing. Another example of a turnout on a Bridge is on the CSX bridge over the...
  10. conrailocs

    blue line or not

    Kurt, I have models from both lines and I believe that the main difference is Blueline locos are sound equipped and DCC ready while Paragon2 locos have sound and already have DCC. There might also be a few differences in the quality of sound and/or detail but to my untrained eyes/ears I don't...
  11. conrailocs

    Turnout on a bridge?

    Here is a picture.
  12. conrailocs

    How can amperage be measured on a layout?

    Hi, My dad and I are building a large layout and currently have a small section of it connected to a NCE Powercab system. We are looking to purchase power boosters and expand the operable territory in the near future. In order to gauge how many boosters we would need, we wanted to run a test...
  13. conrailocs

    Turnout on a bridge?

    Hi, On my railroad I will have a penninsula with a creek running across it. On one of the bridges which is about 4 inches long and single track I will have an Atlas number 4 turnout. I know that this isn't the best location for a turnout but the turnout can't be moved at all in either...
  14. conrailocs

    How can I avoid problems with track expansion?

    Ok Thanks very much.
  15. conrailocs

    How can I avoid problems with track expansion?

    I live in Pennsylvania and we have temperatures well into the 80's during the summer and will have a high of 2 degrees on one day this week. With this change in temperature I've noticed that on the HO railroad I'm building with my dad a few sections of track will expand/contract during certain...
  16. conrailocs

    Grades?

    Sounds good. Thanks!
  17. conrailocs

    Grades?

    Thanks so much for all the help! I'll try doing just what you said. I just recently joined this website and it has been great so far. It's like having tons of friends who are willing to help out with anything you need. Just one more question. If I ran the trains into the removable track...
  18. conrailocs

    Grades?

    ok that makes sense. And I could just put attach the folding "plain" extension to the benchwork however far down from the top as the removeable plywood is thick. Thanks for the idea. How would you suggest connecting the two tracks electrically and physically connecting the rails? For the rails I...
  19. conrailocs

    Grades?

    I was having issues with paint so I'll just try to explain it. After the track to "staging" goes through the tunnel it will stay level and go off the end of the benchwork. The piece of plywood would only be about 5 inches wide. The plywood connected to the benchwork and another piece would be...




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top