well it bit me back. that mountain had to increase and the rest of the company had to drop to fit that part of the layout correctly. The track is in place. The processing plant is in place and the head house is on the mountain itself. I will do the top of this mountain like i did on the other side and flatten it out. I am also working on a plan to use that top of the mountain to come off and give access to the tunnel track and forget the door in front. It don't look right and i am having issues with the hinges staying tight. I will get it but just have to figure out which way to go with it. Have nothing to report on the leg. if i get it in the stand up position it will let me know all about it after awhile. If i get it into a bend when under the layout it will tell me all about it too. I try and put a hour or so to the layout and then rest. Play games on the computer or check out the sites. I take it as easy as i can but get really bored, even with the games, I am really tired of tv. So i try and read a book or something about the railroads from back a 100 years ago. Anyway, shots of the latest fun below. I hope all the folks down in Florida got through all the hurricanes and tornadoes.