My c. 1947-55 layout (the GN in Montana) has a 40-foot long dry creek bed and a through girder bridge in need of a supporting structure.
In the prototype, would a girder bridge ever be supported across its entire length by a trestle only or, as I've seen in a few photos, by stone or concrete...