Search results


  1. GERL

    My network terminal railroad building layout in HO scale

    Thank you very much for the appreciations. No, unfortunately these switches do not exist on the market. However, if you really need a custom-made switch, I can make it for you and that would be happy (free of charge). Best regards
  2. GERL

    Présentations

    Hello and delighted. Yes, making the switches yourself, especially tailor-made according to the curvature of the tracks, saves network space. My network is about 4 meters by 4 meters and has almost 40 needles and crossings. I send some photos to be taken into account. Best regards and wear...
  3. GERL

    Handlaying switches

    Salutations à vous.;)I am very pleased to see your work in manufacturing the switches and crossings.Very good video for turnout construction modelers, in particular to provide technical details of turnout points.:)I am a big fan of making switches and I custom manufacture them according to the...
  4. GERL

    Woodlawn Industrial Park (was Northeastern HO scale switching layout)

    Wow! ;)A beautiful piece and meticulous work.
  5. GERL

    My network terminal railroad building layout in HO scale

    Thanks to every body. And especially for Kleiner= Yes it's an Austrian coach from the famous ancient train 'Mozart ' qui reliait de Paris à Wien, avant l'arrivée des TGV 'Hight Speed Trains) ICE en Autriche on my layout - I'm in Europe. And above the train 'Mozart', it is the train with...
  6. GERL

    Trying to get started (HO scale)

    Hello and delighted. Perhaps the N scale network will work best and if you are a handyman too it can help save all the available space on about 60 feet long.
  7. GERL

    My network terminal railroad building layout in HO scale

    Here is my DIY corner desk and basic tools.
  8. GERL

    My network terminal railroad building layout in HO scale

    Here is my new project to build a set of switches for entering the station on a curved line. Here is the initial plan and a long radius crossing already done first = All the switches will be placed on the left, just after the viaduct in the curve where there is a station = ... throughout...
  9. GERL

    Présentations

    Hello, Greetings too . Thanks
  10. GERL

    Présentations

    Bonjour! Mon nom est Thread in switch. Je pratique généralement l'échelle HO et l'échelle N. Toujours passionné de trains et de modélisme depuis l'enfance. Je construis beaucoup d'aiguillages personnalisés entièrement à la main à l'échelle HO et N. Des références qui ne sont pas dans les...



Back
Top