Simple. Almost all work is in tender.
1. Insulate the one brush holder, I removed the spring and put heat shrink on post.
1a solder a new wire to brush holder.
2. Remove bulbs, install 2mm LED headlight and tiny wires in boiler.
3. drill holes in tender floor to let sound out.
4. drill hole...