Search results

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


  1. R

    Drive Works - (Thank God!)

    Evan posted this on our proboards site tonight. I called him earlier today and his wife said he went into work, I knew he was up to something. Great work Evan. We're just waiting on T1 samples for the plastick, heat sinks, and axle bushing POM. Otherwise all of the production components...
  2. R

    Fan T1 Sample Image / Gears

    Guys, Here are some T1 sample images. We need the sales support, so please send us what you can. The first image shows a test sample shot and photo-graphed by our supplier. There is some work to be done but it looks like the fans will be very nice. Some parts for the hood are also seen...
  3. R

    Fans & Truck POM Moulds

    Guys, The fans mould is basically done, the mould is being improved to ensure all of the parts fill correctly. The truck POM consists of the bearing surfaces for the truck side-frames. Its in EDM machining. Slow going - China is having rolling black outs. Please support the T1 sale...
  4. R

    Clean Air Room Assembly

    We have complete kits posted in our model kits, combinations area, additional units will be posted as we get the final data compiled. Right now the kits discounted 15%, a non-sound unit is $254.57, sound is $339.57. The DCC is provided by ESU. Our drive requires their decoder for motor...
  5. R

    Check this out!

    Hi, Yes. The first full kits will be the SD40-2W, GP38-2W, GP40-2W, and GP40-2L. Next will be some spartan cab releases of both EMD/GMDD prototypes. The initial hood release will do the SD40/40-2, GP40/40-2, GP38-2, and SD38-2. We have both 43' 6" bolster and 34' bolster frames in...
  6. R

    Check this out!

    Guys, These are a bit cleaned up. We have a T1 sale for the next two weeks. The db's, fans, hoods, side-frames, and traction motor T1 samples are all inbound. Another frame production is also in progress and we have clean air room bases and stanchions entering the pre-production T2...
  7. R

    Check this out!

    Guys, I bought a new notebook the other week with a quad core processor and upgraded my 3D CAD program. The end result is that I am finally able to load an entire locomotive assembly into a single file and edit it. I'll be revising the drawings to reflect the actual 3D CAD files used for...
  8. R

    Clean Air Room Assembly

    Guys, We need your support, I have all of the add on components ready to go into tooling for the hood and clean air room - it would be ashame not to have them cover the blank spots. MK 4013 http://www.railflyermodel.com/products/gmdd-wide-cab MK 5001...
  9. R

    Clean Air Room Assembly

    Guys, Stan sent this in. Right now the base is drying, the sides are not glued in yet but are just resting in place. This gives you a good idea of what's going on with the clean air room project. I'll post more as the images come in. Thanks, CJH
  10. R

    New Flag Images

    Here are a few pics of the DP 8001, 8002 on a raw out of the box model. This is the front view of a model with the DP-8002 This is the front view of the GTW Steel style DP-8001 Thanks, the photos were sent in my Stan Sienicki. The parts are all in stock. Christopher...
  11. R

    SD40-2W Build List

    CNR SD40-2W (5241-5363) http://www.cnrphotos.com/gallery2/main.php?g2_itemId=10320 http://www.cnrphotos.com/gallery2/main.php?g2_itemId=10518 SD40-2W Phase Data CNR 5241-5261 1a Hood - (Dynamic Brakes, Small Compressor Door, Low or Standard Roof Components, Round Sand Hatches) /...
  12. R

    New Clean Air Room Base Images

    Guys, Based on these images that Wendy forwarded me, we have the clean air room bases ready for a few quality control checks and then production. You can purchase the bases with these two links: MK 5000 http://railflyermodelprototypes.myshopify.com/products/mk-5000-hood MK 5001...
  13. R

    New GP38-2/SD38-2/GP40/GP40-2/SD40/SD40-2 Hoods and DB Sections

    Yep, We're totally screwed, slow month, then suppliers who are working ahead of schedule and needing more money... Please help us out. The hoods are a lot further along than thought. Here are the initial samples of the DB's. The mould works right out of CNC machining. Just quality...
  14. R

    Drive 2nd Phase

    Guys, We awarded the tooling contracts for the side-frames (Blomberg/HTC) on Friday and got these images from our supplier of some of the stamped items yesterday. The initial Blomberg release will cover the B/M versions. Still trying to get data for the high speed kit if anybody has...
  15. R

    Drive 2nd Phase

    Guys, Evan is about half way with the blomberg modifications for P87. Here is the center bolster section and ball joint interface with the traction motor. We have the side-frames, heat sink, and gearing out for quotations so they can be started right away. As usual everything...
  16. R

    Drive 2nd Phase

    Guys, Our investor has wired funds to our account to start the drive injection mould tooling. I sent out the three side frames for quotation, there will still be some modification to make before production but we're trying to get the ball rolling quickly. We have two moulds planned to...
  17. R

    Spartan Cabs

    Guys, Just so our spartan cabs are 110% accurate, I was able to get my wife talked into letting me bring this into the house to reverse engineer into 3D CAD. That's my three year old train lover beside it. Thanks, our "Black Friday" sale ends tonight. All the best, Christopher...
  18. R

    Speakers, SK-8701

    Guys, We've tested various speakers on the market and came up with SK-8701. It's a self enclosed ported speaker. The product is 8 ohm, 2 watts with 47mm X 16.5mm X 7mm outer dimensions. The speaker has a warm sound quality and is very clear. Our initial shipment is inbound, the MSRP...
  19. R

    Naperville Images - Railflyer

    Guys, These images show our container decals, DS 00052 and DS 00053. We have a number of decal sets in stock. Also attached is a T1 sample image of our Stanchions. The T1 is the first trial to see if the mould design works, enhancements and corrections will follow. They look really good...




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top