I have been doing more on the Grirder Bridge project. I have spent about 6 hours over the last few days adding rivets!!!! Used a lot of those words (that mommy said she would wash my mouth out with soap for using), made a lot of incorrect cuts (mostly too large so it was easily made right), tried to keep my hand from shaking as I moved the decals into place, and only got about 3/4 of the one girder riveted....
I have a long way to go with this project. The whole thing you see is only the first half....
View attachment 53407
Some photos from my N scale project this summer, the Thompson River Canyon, in memory of my brother-in-law. More at http://cprailmmsub.blogspot.ca/2015/09/introducing-n-scale-thompson-river.html
View attachment 53408
View attachment 53409
View attachment 53410
N scale awesomness! KUDO'S on that rock formation above the CN loco!
DATSA nice!
I have been doing more on the Grirder Bridge project. I have spent about 6 hours over the last few days adding rivets!!!! Used a lot of those words (that mommy said she would wash my mouth out with soap for using), made a lot of incorrect cuts (mostly too large so it was easily made right), tried to keep my hand from shaking as I moved the decals into place, and only got about 3/4 of the one girder riveted....
I have a long way to go with this project. The whole thing you see is only the first half....
My favorite locos. The D&RGW SD45s... (I really want to get more of them). These are the Walthers SD45s with DCC/Sound.
What are you using for the rivits???