rhoward
S.L.O.&W. Trainman
Here it is almost Saturday here in the Finger Lakes and none of you have gotten this started yet! You guys are falling down on the job.....
I have finally gotten some trains running after working on the new room for the last several months and doing a lot of scenery in the old room. Feels good even if it is mostly to check the track. This passenger train was the first one through the staging area. Pulled by my largest loco, i figured the long cars and the big engine would find any problems... and it did. Only one turnout gave me any problem at all and that waqs easy to correct.
Since there are no major problem, I started on the upper level which will be an end of the line town someday:
I have been mass producing the Tortiose Assemblys for installing on the new part of the layout. I will need about 3 dozen of these before I am done.
I have finally gotten some trains running after working on the new room for the last several months and doing a lot of scenery in the old room. Feels good even if it is mostly to check the track. This passenger train was the first one through the staging area. Pulled by my largest loco, i figured the long cars and the big engine would find any problems... and it did. Only one turnout gave me any problem at all and that waqs easy to correct.
Since there are no major problem, I started on the upper level which will be an end of the line town someday:
I have been mass producing the Tortiose Assemblys for installing on the new part of the layout. I will need about 3 dozen of these before I am done.