jacon12
Member
Not that I'm close to doing it yet, but I was wondering about this. After I've got the track centers drawn on the benchwork and I'm ready to start permanently laying track, it seems like the right thing to do would be to install all the turnouts first and then connect the flex track to those. Is this the prefered way or does it matter? Is it just as easy to lay the track first and install turnouts when I get to them?
Jarrell
Jarrell