Strasburg Team Track


hamltnblue

Active Member
As noted in the other post there is a new team track added at Strasburg. It is set up as a siding with 2 turnouts. One side merges at the train station and the other merges in the original yard area.

It is being used to load corn into grain cars, although none were present yesterday.

First the track:

IMG_1173.png


IMG_1171.png


The Switcher they're using:

IMG_1153.png


IMG_1155.png
 
They're still using the team track area to unload building supplies. The lumber yard in the paradise area is shut down which is why they're probably using this team track. Some of the building supplies are stacked up in the parking area:



IMG_1175.png


IMG_1176.png
 



Back
Top