crusaderchuck
New Member
Returning to HO .
Presently have a 4x8 platform built , code 100 flex track , switches & cork roadbed purchased. Shopping track plans to see what's available as a starting point. Presently I simply want to run 2 trains and sidings or industry have not been decided. Something very nostalgic about starting around John Allen's initial layout with some fine tuning to run 2 trains at the same time. Thoughts? Also DC not DCC. Will be running Varney , early Mantua and Penn Line/bowser type/Era equipment. If anything newer finds its way to me , GREAT! SSI budget limits my purchasing power. Been collecting the needed supplies for over a year now. Finally have enough basic material to lay track once I have a track plan decided upon.
Presently have a 4x8 platform built , code 100 flex track , switches & cork roadbed purchased. Shopping track plans to see what's available as a starting point. Presently I simply want to run 2 trains and sidings or industry have not been decided. Something very nostalgic about starting around John Allen's initial layout with some fine tuning to run 2 trains at the same time. Thoughts? Also DC not DCC. Will be running Varney , early Mantua and Penn Line/bowser type/Era equipment. If anything newer finds its way to me , GREAT! SSI budget limits my purchasing power. Been collecting the needed supplies for over a year now. Finally have enough basic material to lay track once I have a track plan decided upon.